Overview:

The project involves providing civil design services for the design of a new storm drain system in Rose Drive. During storm events, the northeast corner of the Rose Drive and Bastanchury Road intersection experiences localized flooding. A concept proposed by the city to mitigate these concerns is to provide a storm drain from the Bastanchury Road/Rose Drive intersection along Rose Drive to be connected to the existing 39-inch El Cajon Avenue storm drain. We prepared a preliminary drainage report and conducted a hydrology study for all concepts, and prepared PS&E documents.